From the 28th till the 29th of September 2026, transport operations will be carried out alongside the left – and right bank of the Suriname River. Pipelines will be transported from Suzannasdaal to Dordrecht with the tugboat Kees Jr. & barge Corantijn 06.
The operation area is indicated by the following coordinates:
WGS ‘84 | Latitude | Longitude |
Loading | 05° 51’.719 N | 055° 06’.042 W |
Unloading | 05° 49’.835 N | 055° 05’.850 W |
Please note:
All ships should approach the above-mentioned area with caution and reduce speed while passing.