From 01st of September till 31st of October 2026 dredging activities will take place alongside the left bank of the Suriname River at Kuldipsingh Port Facility by the dredgers TSHD Mahury, Victoria 1, Victoria 2 and excavators.
The working area is indicated by the following coordinates in WGS 84:
WGS ‘84 | Latitude | Longitude |
A | 05° 46’.499 N | 055° 09’.189 W |
B | 05° 46’.511 N | 055° 09’.175 W |
C | 05° 46’.649 N | 055° 09’.312 W |
D | 05° 46’.659 N | 055° 09’.299 W |
The dredging activities will be carried out 24 hours a day. The dredged material will be dumped on the western side of the entrance of the Suriname River outside the navigation channel. The dredging vessels will be restricted in maneuverability during dredging and will display the necessary lights and day shapes.
Communication is through VHF channel 12.
All ships should take notice of the above mentioned.