Tide values 22 July
December 8, 2015Botenrace
December 9, 2014NOTICE TO MARINERS NO.77/2021T
ANNOUNCEMENT TO THE SHIPPING TRAFFIC
CHART 2765
SURINAME RIVER, DIJKVELDBANK
DREDGING ACTIVITIES KULDIPSINGH PORT FACILITY
From 4th till the 8th of December 2021 dredging activities will be conducted alongside the left bank of the Suriname River at the “Kuldipsingh Port Facility” by the dredger Lesse.
The working area is indicated by the following coordinates in WGS 84:
Latitude Longitude
A 05° 46’.669 N 055° 09’.329 W
B 05° 46’.679 N 055° 09’.316 W
C 05° 46’.510 N 055° 09’.177 W
D 05° 46’.500 N 055° 09’.190 W
The operations will take place around the clock (24 hours). The dredger Lesse will be restricted in maneuverability during dredging and will carry the necessary lighting and signs. The dredged material will be dumped on the western side of the entrance of the Suriname River outside the navigation channel.
Communication is through VHF channel 12.
All ships should take notice of the above mentioned.