NtM no. 120 Ship to ship transfer
November 12, 2020NtM no. 122 Warm Stacking
December 1, 2020NOTICE TO MARINERS NO.121/2020T
ANNOUNCEMENT TO THE SHIPPING TRAFFIC
CHART 2765
ENTRANCE SURINAME RIVER
HYDROGRAPHIC SURVEYS
From 23rd till 27th November 2020 hydrographic surveys will be conducted daily from 7:00 am – 7:00 pm in the estuary of the Suriname River with the survey vessels MARWINA and PASISI.
The survey area is bounded by the following coordinates:
WGS ‘84 Latitude Longitude
A 06° 03′.853 N 055° 13′.014 W
B 05° 58′.991 N 055° 13′.118 W
C 05° 57′.474 N 055° 12′.237 W
D 05° 56′.508 N 055° 10′.864 W
E 05° 56′.736 N 055° 10′.724 W
F 05° 57′.611 N 055° 12′.003 W
G 05° 59′.059 N 055° 12′.844 W
H 06° 03.848 N 055° 12′.743 W
The survey vessels Marwina and Pasisi will be restricted in maneuverability during the surveys and will navigate at a speed of approximately 4 (four) knots.
Communication is through VHF channel 12.
All ships and other users should take notice of the above mentioned.