BAZ no. 22 Baggerwerkzaamheden de Molen Havenfaciliteit
February 15, 2020BAZ no. 23 Passage vaartuig
February 15, 2020NOTICE TO MARINERS NO.22/2020T
ANNOUNCEMENT TO THE SHIPPING TRAFFIC
CHART 2765
SURINAME RIVER, DIJKVELDBANK
DREDGING ACTIVITIES DE MOLEN PORT FACILITY
From 14th to 17th February, 2020 dredging activities will be conducted alongside the left bank of the Suriname River at the jetty of “De Molen Port Facility” (position 05 47’.675N – 055 09’.720W) with a crawler crane with the vessel Taurus-01 and with tow barge 05.
The vessel Taurus-01 will be restricted in maneuverability during dredging.
Communication is through the VHF channel 10.
All ships should take notice of the above mentioned