BAZ no. 15 Baggerwerkzaamheden Vensur havenfaciliteit
February 5, 2020BAZ no. 16 Baggerwerkzaamheden De Molen havenfaciliteit
February 6, 2020NOTICE TO MARINERS NO.15/2020T
ANNOUNCEMENT TO THE SHIPPING TRAFFIC
CHART 2765
SURINAME RIVER, DIJKVELDBANK
DREDGING ACTIVITIES VENSUR PORT FACILITY
From 6th to 8th February 2020 dredging activities will be conducted alongside the left bank of the Suriname River at the jetty of “Vensur Port Facility” (position 05 46’.224N – 55 08’.937W) with the Trailing Suction Hopper named LESSE.
The vessel LESSE will be restricted in maneuverability during dredging.
Communication is through the VHF channel 12.
All ships should take notice of the above mentioned.