With reference to NtM No.57/2024T, regarding the shipping regulations at the Saramaccadoorsteek bridge, the shipping is informed that the channel will be temporary closed from 23rd September till 07th October 2024.
There will be daily lifting operations to place girders and sheet piling. The pontoon KDS-KP001 will assist in the execution of the work. After the daily work, the pontoon will be shored along the bank of the channel. The pontoon will be unmanned and unpowered and will display the relevant navigation lights.
Restriction:
All ships should take notice of the above-mentioned.