From November 20th till November 26th, and December 15th till December 22nd, 2023, dredging- and survey works will take place alongside the left bank of the Suriname River at the jetty of Rubis Port Facility with the dredger MV Parana and survey vessel Argus 1
The working area is indicated by the following coordinates in WGS 84:
WGS ‘84 | Latitude | Longitude |
A | 05° 45’.249 N | 055° 07’.922 N |
B | 05° 45’.223 N | 055° 07’.811 N |
C | 05° 45’.321 N | 055° 07’.990 N |
D | 05° 45’.431 N | 055° 08’.026 N |
The dredging vessel will be restricted in maneuverability during dredging and will carry the necessary lights and signs. The dredged material will be dumped on the western side of the entrance of the Suriname river outside the navigation channel.
Communication is through VHF channel 12.
All ships should take notice of the above-mentioned.