From 21st of October till 15th of December 2025 dredging activities will be conducted alongside the left bank of the Suriname River at Rubis Jetty with the dredgers MV Parana and MV Kees Jr.
The working area is indicated by the following coordinates in WGS 84:
WGS ‘84 | Latitude | Longitude |
A | 05° 45’.249 N | 055° 07’.922 W |
B | 05° 45’.223 N | 055° 07’.811 W |
C | 05° 45’.321 N | 055° 07’.990 W |
D | 05° 45’.431 N | 055° 08’.026 W |
The dredging activities will take place around the clock. The dredged material will be dumped on the western side of the entrance of the Suriname River outside the navigation channel. The dredging vessels will be restricted in maneuverability during dredging and will carry the necessary lights and signs
Communication is through VHF channel 12.
All ships should take notice of the above mentioned.