From the 12th of June till the 27th of July 2025 rehabilitation work will be conducted at the canal lock (05° 47′.781 N – 055° 09′.884 W WGS 84) in the Saramacca Canal.
The area is completely closed to shipping during this period.
The public should take notice of the above-mentioned.