From 23rd of May till 23rd of July 2025 dredging activities will take place alongside the left bank of the Suriname River at Kuldipsingh Port Facility by the dredger TSHD Parana and plow vessel Kees Jr.
The working area is indicated by the following coordinates in WGS 84:
WGS ‘84 | Latitude | Longitude |
A | 05° 46’.499 N | 055° 09’.189 W |
B | 05° 46’.511 N | 055° 09’.175 W |
C | 05° 46’.649 N | 055° 09’.312 W |
D | 05° 46’.659 N | 055° 09’.299 W |
The dredging activities will take place around the clock. The dredging vessel TSHD Parana will suck up the dredged material from the river bottom. The dredged material will be dumped on the western side of the entrance of the Suriname River outside the navigation channel. The vessels will be restricted in maneuverability during dredging and will carry the necessary lighting and signs.
Communication is through VHF channel 12.
All ships should take notice of the above-mentioned.