Notice to Mariners 2021
January 15, 2020MAS Publications
January 22, 2021NOTICE TO MARINERS NO.30/2020T
ANNOUNCEMENT TO THE SHIPPING TRAFFIC
CHART 2765
ENTRANCE SURINAME RIVER
HYDROGRAPHIC SURVEYS
In connection with the Suriname River Dredging Project, the survey vessel MARWINA will carry out hydrographic surveys at the entrance of the Suriname River from February 24th till February 29th ,2020. The surveys will be conducted daily from 7:00 am – 7:00 pm.
The survey area is bounded by the following coordinates:
WGS ‘84 Latitude Longitude
A 06° 10′.037 N 055° 12′.494 W
B 06° 10′.044 N 055° 13′.755 W
C 05° 57′.529 N 055° 13′.784 W
D 05° 54′.889 N 055° 10′.215 W
E 05° 56′.151 N 055° 09′.436 W
F 05° 57′.717 N 055° 11′.805 W
G 05° 58′.978 N 055° 12′.506 W
Communication is through VHF channel 12
All ships and other users should take notice of the above mentioned.