From 17th March till 12th of April 2024 dredging activities will be conducted alongside the left bank of the Suriname River at Rubis Jetty with the dredger MV Kees Jr.
The working area is indicated by the following coordinates in WGS 84:
WGS ‘84 | Latitude | Longitude |
A | 05° 45’.249 N | 055° 07’.922 W |
B | 05° 45’.223 N | 055° 07’.811 W |
C | 05° 45’.321 N | 055° 07’.990 W |
D | 05° 45’.431 N | 055° 08’.026 W |
The dredging activities will take place around the clock. The dredging vessel will be restricted in maneuverability during dredging and will carry the necessary lights and signs. The dredged material will be dumped on the western side of the entrance of the Suriname River outside the navigation channel.
Communication is through VHF channel 12.
All ships should take notice of the above mentioned.