With reference to NtM No.18/2024T regarding preparatory work for the dismantling of the Saramaccadoorsteek bridge, the shipping is informed that the channel will be temporarily closed in the following periods:
The pontoon K1005 will be used for the execution of the work, which will be propped up along the bank of the canal every day after the work. The pontoon K1005 is unmanned, not powered, and will carry the relevant navigation lights.
Restriction:
All ships should take notice of the above-mentioned.
e-mentioned.