From the 03rd till 8th of March 2024, maintenance work will be carried on the submarine cable off the coast, at ninety-four nautical miles (94 NM) northern off the Suriname River by the maintenance vessel Wave Sentinel at the location 07° 24’.965N – 056°04’.715W (WGS84).
Please note:
All ships should take notice of the above-mentioned.