NOTICE TO MARINERS NO.02/2025T
ANNOUNCEMENT TO THE SHIPPING TRAFFIC
CHART 2765/2218
SURINAME RIVER – PARAMARIBO
DREDGING ACTIVITIES JULES SEDNEY PORT
From 14th till 25th of January 2025 dredging activities will take place alongside the left bank of the Suriname River at Jules Sedney Port with the dredger MV Parana.
The working area is indicated by the following coordinates in WGS 84:
WGS ‘84 | Latitude | Longitude |
A | 05° 48’.553 N | 055° 09’.924 W |
B | 05° 48’.894 N | 055° 09’.855 W |
C | 05° 48’.905 N | 055° 09’.909 W |
D | 05° 48’.565 N | 055° 09’.986 W |
The dredging activities will take place around the clock. The dredging vessel will be restricted in maneuverability during dredging and will carry the necessary lights and signs. The dredged material will be dumped on the western side of the entrance of the Suriname River outside the navigation channel.
Communication is through VHF channel 12.
All ships should take notice of the above mentioned.