From December 24th, 2025 till February 18th, 2026, the drill ship Stena DrillMAX will conduct exploration drilling at one hundred and twenty-three nautical miles (123 NM) off the coast of Suriname at the drilling location 07° 58’.331 N – 054° 20’.045 W (WGS 84).
For safety reasons, vessels should keep a safe distance of at least one nautical mile (1 NM) from the drill ship. The platform supply vessels that will assist during the operations are C-VALIANT and GARY ROOK.
Please note:
All ships should take notice of the above-mentioned.