With reference to NtM NO.42/2022T, regarding exploration drilling by the drill ship Maersk Voyager, the public is informed that she will be moved to the drilling site 07° 59.242’ N – 056° 05.425’ W (WGS 84). The drill ship will conduct exploration drilling off the coast of Suriname from 15th August 2022 till 15th October 2022.
For safety reasons vessels should keep a safe distance of 1000 (one thousand) meters from the drillship.
Please note:
All ships should take notice of the above mentioned.